Feasibility Study: Joshua Engineering
Architect/Engineer: Joshua Engineering
Total Project Cost: $2,393,152 (CIP)
Contractor (CSP): TBD
Status: Design is 30% complete.
Due to funding limitations for the project, the University engaged the Architect to develop a feasibility study to further define the limits of project scope, including condition analysis, conceptual schematic designs, and cost estimate. A conceptual design and construction cost estimate were approved by the University, and a fee proposal presented by the A-E.